Avenue Road prime residence — bathroom delivered by Toner M&E
Track record · Completed projects

Delivered, documented,
trusted again.

Eleven full case studies from across our portfolio — £67m prime residences, national rail infrastructure and large-scale residential schemes, every one handed over right first time.

0
Completed schemes
0
Live on site now
0+
Years established
Prime residence

London's finest homes,
quietly engineered.

Multi-million-pound private residences where the services disappear into the craft.

Completed June 2022Avenue Road, Swiss Cottage — completed interior
01 — Prime Residence

Avenue Road, Swiss Cottage

ClientPrivately Owned
Main contractorKnowles
MEP consultantToner M&E Design
CompletedJune 2022

Full refurbishment of a £67,000,000 house in St John's Wood — including excavation of a double basement for indoor and outdoor swimming pools and a health centre, plus an underground car park serviced by an external car lift.

Toner M&E packageFull mechanical fit-out including multiple air source heat pumps, a fully operational plant room with cold water booster, water tank and softener, and underfloor heating throughout. All custom-made sanitaryware installed by Toner M&E.
Avenue Road exterior Avenue Road interior detail Avenue Road bathroom Avenue Road swimming pool Avenue Road leisure suite Avenue Road finished room
Completed Summer 2023Oakwood Court, Kensington — apartment interior
02 — Prime Residence

Oakwood Court, Kensington

ClientPrivately Owned
Main contractorBelrock Construction
MEP consultantToner M&E Design
CompletedSummer 2023

Complete refurbishment of a £5,000,000 eighth-floor apartment in Kensington spanning over 300 square metres — three bedrooms, three bathrooms, two private working studios, three large reception, dining and living areas, and a bespoke plant room.

Toner M&E packageFull mechanical fit-out including design, supply and installation of all plant room items — cold water booster set, gas boiler and water softener — plus underfloor heating throughout and first and second fix of high-specification bathrooms with a custom-made feature bath.
Oakwood Court living space Oakwood Court interior Oakwood Court detail Oakwood Court bathroom Oakwood Court feature bath Oakwood Court plant room detail
Completed Summer 2022Station House, Canonbury — converted interior
03 — Prime Residence

Station House, Canonbury

ClientPrivately Owned
Main contractorCapital Construction
MEP consultantToner M&E Design
CompletedSummer 2022

A repurpose build turning the previously active station house of Canonbury Overground Station into a five-bedroom, four-bathroom split-level apartment across three floors.

Toner M&E packageFull mechanical fit-out including above-ground drainage, gas boiler, hot water cylinder and water softener, plus underfloor heating throughout. Every bespoke bathroom was individually designed by Toner M&E with the client to meet each family member's needs.
Station House interior Station House bathroom Station House bedroom Station House living area Station House split level Station House finished space
Commercial & infrastructure

Delivered around
live operations.

Pubs, hotels and national rail — complex services installed while the doors stayed open.

Completed Feb 2021The Bull & Last, Hampstead — refurbished pub
04 — Commercial

The Bull & Last, Hampstead

ClientEtive Pubs Ltd
Main contractorKnowles Developments
MEP consultantD Haus Company Ltd
CompletedFebruary 2021

Refurbishment of a well-known 18th-century pub, alongside the construction of high-end hotel rooms and new-build residential apartments.

Toner M&E packageDomestic plumbing, heating, drainage, gas and ventilation works — including the installation of a fully operational plant room serving the whole building.
Bull & Last exterior Bull & Last hotel room Bull & Last interior Bull & Last dining space Bull & Last bar Bull & Last bathroom
Completed July 2022Crawley Train Station — refurbished concourse
05 — Infrastructure

Crawley Train Station

ClientNetwork Rail
Main contractorToureen Group
MEP consultantKH Engineering
CompletedJuly 2022

Full refurbishment of the existing Crawley Train Station — the complete strip-out and reconfiguration of the ticket office, waiting area and multiple platforms, all while the station remained fully operational.

Toner M&E packageComplete MEP package throughout, including supply and installation of internal and external lighting, CCTV, water services, air conditioning and EV charging points.
Crawley station works Crawley platform lighting Crawley ticket office Crawley concourse Crawley external works Crawley completed platform
Residential development

Homes at scale,
handed over right.

Hundreds of apartments for national developers and housing associations — full M&E packages, first fix to final commissioning.

Completed Oct 2024Ivy Lane Phase 1, Oxford — completed scheme
06 — Residential

Ivy Lane (P1), Oxford

ClientA2Dominion
Main contractorThe Hill Group
MEP consultantWarburtons
CompletedOctober 2024

A new-build residential scheme of 68 apartments and 57 cluster units across three blocks within the grounds of the St John Radcliffe Hospital — housing a minimum of 340 key workers for the local trust. Its success led directly to Toner's appointment on Phase 2, now on site.

Toner M&E packageFull mechanical package including booster cold water distribution, bathroom pods to cluster units and air source heat pump cylinders throughout. Sanitaryware supplied and installed by Toner M&E.
Ivy Lane P1 on site Ivy Lane P1 installation Ivy Lane P1 apartments Ivy Lane P1 completed block Ivy Lane P1 handover Ivy Lane P1 finished scheme
Completed March 2023Cheshunt Lakeside Phase 1A
07 — Residential

Cheshunt, Phase 1A

ClientB3 Living
Main contractorInland Homes
MEP consultantPatrick Parsons
CompletedMarch 2023

The first phase of construction at Cheshunt Lakeside, in partnership with B3 Living, a local housing association — a mixed-use development of 195 affordable homes spanning six blocks across two buildings.

Toner M&E packageFull mechanical and electrical package to apartments and communal areas, including sprinkler protection, smoke prevention and control system installations.
Cheshunt Lakeside block Cheshunt Lakeside construction Cheshunt Lakeside apartments Cheshunt Lakeside exterior Cheshunt Lakeside services Cheshunt Lakeside completed
Completed Nov 2024Collins House, Gerrards Cross
08 — Residential

Collins House, Gerrards Cross

Main contractorLife Less Ordinary
MEP consultantACE
Scale36 apartments
CompletedNovember 2024

Conversion of a building comprising four ground-floor retail units, a library and two floors of offices — with a side and rear extension and an additional rooftop floor — delivering 36 one- and two-bedroom apartments.

Toner M&E packageFull mechanical and electrical package including sprinkler protection, smoke prevention, access control, MVHRs and ASHP cylinders.
Collins House visual Collins House exterior Collins House living space Collins House apartment Collins House interior Collins House kitchen
Completed Sept 2025The Crofton, Orpington
09 — Residential

The Crofton, Orpington

Main contractorLife Less Ordinary
MEP consultantiTS Consultancy
Scale41 homes
CompletedSeptember 2025

The creation of 41 new homes in the heart of Orpington High Street — a mix of one, two and three-bedroom flats.

Toner M&E packageFull mechanical and electrical package to apartments and communal areas, including sprinkler protection, smoke prevention and control system installations.
The Crofton works The Crofton installation The Crofton services The Crofton apartments The Crofton exterior The Crofton completed
Completed July 2026Novello, Maidenhead — completed exterior
10 — Residential

Novello, Maidenhead

Main contractorLife Less Ordinary
MEP consultantiTS Consultancy
Scale31 apartments
CompletedJuly 2026

The conversion of a former office building into 31 one- and two-bedroom apartments across three storeys — handed over in July 2026.

Toner M&E packageFull mechanical and electrical package to apartments and communal areas — including sprinkler protection, smoke prevention and control systems, CCTV and access control.
Novello — finished kitchen Novello — completed bathroom with backlit mirrors Novello — finished bedroom Novello — heat pump cylinder and utility installation Novello — basement electrical switchgear Novello — water storage plant room
Completed Aug 2022Latimer Road, W10
11 — Residential

Latimer Road, W10

ClientStuart McCurry & Partners
Main contractorBelrock Construction
MEP consultantNoble Structures
CompletedAugust 2022

Construction of eight private apartments and a large commercial space — demolition of the existing building, below-ground drainage, an RC frame to four floors, brickwork to the building envelope, M&E throughout, and a high-end fit-out to turnkey.

Toner M&E packageDomestic plumbing, heating, above-ground drainage (cast iron) and gas works — including full fit-out to bathrooms and kitchens throughout.
Latimer Road exterior Latimer Road interior Latimer Road bathroom Latimer Road kitchen Latimer Road apartment Latimer Road finished space
Also delivered

And the rest of
the portfolio.

Three further schemes delivered for our main contractor partners.

Byron Street, Poplar

Byron Street, Poplar

Aitch Construction
Randalls, Uxbridge

Randalls, Uxbridge

Inland Homes
Chester Square, Chelsea

Chester Sq, Chelsea

Belrock Construction

Your project could be
the next case study.

Start your project
See the company's latest news here →